How long does it take to install solid floor insulation?

The installation time for solid floor insulation can vary based on the specifics of the project, such as the area size and preparation needed. For an average-sized room, the process typically takes about a day to complete. However, if the installation involves removing old flooring or extensive subfloor preparation, it could extend to several days.